Next WBTS retrofit completed at Nauta

Nauta Shiprepair Yard has just completed next Ballast Water Treatment System retrofit. This time the system was installed on a 183 m long tanker MT Forres Park managed by Executive SM, Singapore.

© Nauta Shiprepair Yard. All rights reserved.
Design and administration by eximius.pl