2019

01.03.2019

1st launching ceremony in Nauta Shipyard in 2019

On March 1st , Nauta Shipyard launched a newly built partly outfitted fishing vessel for its Norwegian client - . Fitjar Mekaniske Verksted A.S. It was the first launching ceremony in Newbuilding Division this year.

CETUS is 65 m long and 14 m wide. Cetus A.S. of Norway will be the final owner of the ship.

27.02.2019

Next WBTS retrofit completed at Nauta

Nauta Shiprepair Yard has just completed next Ballast Water Treatment System retrofit. This time the system was installed on a 183 m long tanker MT Forres Park managed by Executive SM, Singapore.

15.01.2019

Maestro Universe in Nauta

Nauta completed works on board Ro-Ro vessel m/v Maestro Universe , flying colours of Meastro Shipmanagement Ltd, Cyprus. The works were conducted in the SD I graving dry dock (240m x 40m).

The vessel with LOA 160 m and beam of 22m underwent her SS.

12.01.2019

Polish Navy ORP Druzno back in service

Nauta completed upgrading of one of the Polish Navy minesweepers of type 207.

The main engines of Russian M401A-1 type were exchanged by MTU 8V2000 M72 engines. Apart of this new Cummins engines and Stamford generators were added. Together with machinery works the accommodation of the vessel was completely rebuilt.

© Nauta Shiprepair Yard. All rights reserved.
Design and administration by eximius.pl